Lilongwe Water Board constructs 3rd Water Treatment: To be ready in May, 2026
[Nyasa Times - Malawi] - 23/10/2025
The Lilongwe Water Board (LWB) has disclosed that the construction of its Third Water Treatment plant with a capacity of 50,000 cubic metres per day will be completed in March, 2026. The plant is funded by European Investment Bank (EIB) to the tune of Euros 20million. LWB Chief Executive Officer (…)
... Article published by "Nyasa Times" (Malawi), read more
For any information or claim on this article, see directly with the newspaper.
In Malawi newspapers
SCANDALA|| Headteacher Walks Into Guesthouse to Have Fun With a Married Woman Before Being Caught Pants Down
KENYA|| Tension gripped Siaya County after a local headteacher and a married woman were caught in an (…)
[Face Of Malawi] - 23/10/2025
Breaking the Silence: Lilongwe Hosts Bold Public Lecture on Sexual Orientation and Inclusion
Lilongwe is tonight set to host a powerful and potentially transformative public lecture that challenges society to (…)
[Nyasa Times] - 31/10/2025
This Is Shocking!|| Widow locked inside husband’s ambulance, forced to drink corpse bath water after being accused of killing (…)
A disturbing incident has been reported from Isieke, Awo-Omamma in Imo State, where a widow was allegedly locked (…)
[Face Of Malawi] - 27/10/2025
FIFA Women’s World Cup Brazil™ 2027 qualification begging for Scorchers to grab at the WAfCON Morocco 2026
* Beyond the race for the continental crown, the WAfCON 2026 carries high stakes — qualification for the FIFA (…)
[Maravi Express] - 30/10/2025
MCP Deputy Director of Recruitment Esther Kathumba Resigns
Deputy Director of Recruitment in the Malawi Congress Party (MCP), Esther Kathumba, has resigned. In a letter (…)
[Face Of Malawi] - 23/10/2025

